Original Article | 2018, Vol.40, No.5, pp. 1203-1218

A memetic algorithm to minimize the total sum of earliness tardiness and sequence dependent setup costs for flow shop scheduling problems with job distinct due windows

  • 152 Views
  • 253 Download

PDF

PDF w/Links